Sweetwater Fishing Forums

General Category => News Views & Press Releases => Topic started by: Editor on September 04, 2017, 04:01:10 PM

Title: Tumbledown Creek Bridge
Post by: Editor on September 04, 2017, 04:01:10 PM
Tumbledown Creek Bridge

Hydro Tasmania has recently inspected the
bridge over Tumbledown Creek (Gunns Marsh
Road, Arthurs Lake) and it was found to have
structural issues.
The load rating of the bridge has been reduced
to 2 tons to allow its ongoing safe operation,
and revised load limit signage has been
installed.
Please exercise caution when using the bridge
and adhere to the revised load rating.
The long term plan for the bridge is currently
under review, and Hydro Tasmania will advise
when this has been determined.
For further information please contact Hydro
Tasmania on (03) 6230 5111 or
contactus@hydro.com.au
Source: Tumbledown Creek Bridge (https://www.ifs.tas.gov.au/news/tumbledown-creek-bridge)