Author Topic: Sunshine Coast to benefit as Seqwater reverses Northern Pipeline Interconnector  (Read 5195 times)

0 Members and 1 Guest are viewing this topic.

Offline Member

  • Administrator
  • Legend Member
  • *****
  • Thank You
  • -Given: 2
  • -Receive: 369
  • Posts: 1728
  • Liked: 70
  • Karma: 376
  • Sweetwater Fishing Fanatic
  • View Gallery
Sunshine Coast to benefit as Seqwater reverses Northern Pipeline Interconnector to supply water north

Posted  29 July 2014  - Seqwater   

Seqwater will next week reverse the flow of water in stage 1 of the Northern Pipeline Interconnector (NPI), for the first time supplying the Sunshine Coast with water sourced from North Pine Dam, near Petrie.
 
The NPI flow reversal will reduce the draw on the Sunshine Coast’s Lake Baroon during what is traditionally a dry time of year.
 
Seqwater Chief Executive Officer Peter Dennis said the switching of the NPI to supplement the Sunshine Coast supply from outside the region demonstrated the benefit of an integrated bulk water supply network.
 
“Seqwater’s integrated network allows us to move water around South East Queensland to where it’s most needed,” Mr Dennis said.
 
“Water security across the region remains high. Having an integrated network means that the Sunshine Coast no longer has to rely on its local sources of water.
 
“We intend to have the water flow in a northerly direction along the NPI for a month but will monitor water supplies on a daily basis and adjust if required.”
 
Mr Dennis said stage 1 of the NPI, between Moreton Bay and the Landers Shute Water Treatment Plant near Montville, was completed in 2009 but had only ever operated in a southerly direction for operational purposes.
 
“NPI stage 2, between the Landers Shute Water Treatment Plant and Noosa Water Treatment Plant, has flowed in both directions. It has been reversed several times this year as we balance water storage and supply needs across the network,” he said.
 
“But apart from a test when stage 2 of the pipeline was commissioned in 2012, we have never needed to pump water along stage 1.
 
“So this is the first time that both stages will flow north together.”
 
“The reversal of the NPI and supply of water north from North Pine Water Treatment Plant will reduce dependency on Lake Baroon, resulting in the Landers Shute Water Treatment Plant reducing production from around 100 mega litres a day to about 50 mega litres a day.”
 
Mr Dennis said assets such as the NPI enabled Seqwater to continue to deliver a safe, secure and reliable bulk water supply for South East Queensland.

Sorry, only registered users can see this content. Please Login or Register.


Sweetwater Fishing Home http://www.sweetwaterfishing.com.au

Offline Member

  • Fish Restocker
  • Legend Member
  • *
  • Thank You
  • -Given: 604
  • -Receive: 413
  • Posts: 927
  • Liked: 28
  • Karma: 416
  • Gender: Male
  • Sweetwater Fishing Fanatic
  • View Gallery
  • Favourite Fishing Spot is: north pine dam
Shame that they could not utilize water from Kurwongbah instead of just cutting hole in dam wall to reduce capacity to 50%.
 Cheers
Ray

Offline Member

  • Fish Restocker
  • Legend Member
  • *
  • Thank You
  • -Given: 180
  • -Receive: 470
  • Posts: 937
  • Liked: 8
  • Karma: 475
  • Gender: Male
  • All Waters Fishing Fanatic
  • View Gallery
  • Favourite Fishing Spot is: The Brisbane River
There cutting a hole in the dam wall ?

Offline Member

  • Fish Restocker
  • Legend Member
  • *
  • Thank You
  • -Given: 604
  • -Receive: 413
  • Posts: 927
  • Liked: 28
  • Karma: 416
  • Gender: Male
  • Sweetwater Fishing Fanatic
  • View Gallery
  • Favourite Fishing Spot is: north pine dam
That is what i heard 2 metre hole that they will fill with logs and control flow by removing logs.
 Cheers
Ray

Offline Member

  • Fish Restocker
  • Legend Member
  • *
  • Thank You
  • -Given: 180
  • -Receive: 470
  • Posts: 937
  • Liked: 8
  • Karma: 475
  • Gender: Male
  • All Waters Fishing Fanatic
  • View Gallery
  • Favourite Fishing Spot is: The Brisbane River
Pumping NPD north they would use Kurwongbah you would think.














Offline Member

  • Fish Restocker
  • Legend Member
  • *
  • Thank You
  • -Given: 604
  • -Receive: 413
  • Posts: 927
  • Liked: 28
  • Karma: 416
  • Gender: Male
  • Sweetwater Fishing Fanatic
  • View Gallery
  • Favourite Fishing Spot is: north pine dam
Pumping NPD north they would use Kurwongbah you would think.
That is what I thought so i contacted SEQ water and they bsaid that kurwongbah feeds Petrie treatment works which is not connected to the interconnect.
Still strange why they are doing it as Mcdonald and Ewan Maddock both over 90% and Baroon Pocket 60%
Cheers
Ray

 

Related Topics

  Subject / Started by Replies Last post
3 Replies
6876 Views
Last post September 04, 2011, 09:08:52 AM
by Member
0 Replies
2932 Views
Last post October 26, 2011, 08:16:17 PM
by TAS Fisheries, Editor
0 Replies
2031 Views
Last post January 25, 2012, 10:11:58 AM
by Member
0 Replies
4046 Views
Last post November 21, 2012, 07:20:44 PM
by Member
1 Replies
3605 Views
Last post February 02, 2014, 06:54:41 AM
by Member

Upcoming Events, Fishing Competitions, Shows, Expos etc.....


Upcoming Events