Sweetwater Fishing Forums

General Category => Weather and Water Updates => Topic started by: aussiebasser on January 16, 2011, 08:22:59 PM

Title: Lockyer Creek, the aftermath
Post by: aussiebasser on January 16, 2011, 08:22:59 PM
This is the bridge over the Lockyer on the Gatton to Esk road.
Title: Re: Lockyer Creek, the aftermath
Post by: aussiebasser on January 16, 2011, 08:25:33 PM
A feeder creek to the Lockyer at Patrick estate.  First pic is a culvert before the bridge heading into Lowood there's an old bridge in the gully where the traffic goes now.  Second shows how hight the water was with clothes up in the tree.
Title: Re: Lockyer Creek, the aftermath
Post by: aussiebasser on January 16, 2011, 08:28:47 PM
The new bridge at Patrick Estate.  Water level was 7 metres above the bridge.  The old caravan at the top of the gully was under water.