Members can see more Boards, Topics, Picture Galleries, Videos, Games and more. Register NOW...
Recent Pictures (List All)

Rating: (None)
Views: 34
Comments (0)

Rating: (None)
Views: 37
Comments (0)

Rating: (None)
Views: 35
Comments (4)

Rating: (None)
Views: 25
Comments (0)
*

Author Topic: Tumbledown Creek Bridge  (Read 2187 times)

0 Members and 1 Guest are viewing this topic.

Offline Member

  • Administrator
  • Legend Member
  • *****
  • Thank You
  • -Given: 2
  • -Receive: 369
  • Posts: 1728
  • Liked: 70
  • Karma: 376
  • Sweetwater Fishing Fanatic
  • View Gallery
Tumbledown Creek Bridge
« on: September 04, 2017, 04:01:10 PM »
Tumbledown Creek Bridge

Hydro Tasmania has recently inspected the
bridge over Tumbledown Creek (Gunns Marsh
Road, Arthurs Lake) and it was found to have
structural issues.
The load rating of the bridge has been reduced
to 2 tons to allow its ongoing safe operation,
and revised load limit signage has been
installed.
Please exercise caution when using the bridge
and adhere to the revised load rating.
The long term plan for the bridge is currently
under review, and Hydro Tasmania will advise
when this has been determined.
For further information please contact Hydro
Tasmania on (03) 6230 5111 or
contactus@hydro.com.au
Source: Tumbledown Creek Bridge


Sweetwater Fishing Home http://www.sweetwaterfishing.com.au

 

Related Topics

  Subject / Started by Replies Last post
1 Replies
6964 Views
Last post December 21, 2010, 10:35:54 PM
by Member
3 Replies
6903 Views
Last post September 16, 2014, 03:29:38 PM
by Member
kholo bridge

Started by joey1247 General Discussion

7 Replies
11542 Views
Last post November 19, 2012, 10:26:16 PM
by joey1247
9 Replies
6151 Views
Last post December 26, 2012, 10:20:06 AM
by Member
0 Replies
5170 Views
Last post July 26, 2018, 10:00:55 AM
by Member

Upcoming Events, Fishing Competitions, Shows, Expos etc.....


Upcoming Events