Members can see more Boards, Topics, Picture Galleries, Videos, Games and more. Register NOW...
Recent Pictures (List All)

Rating: (None)
Views: 34
Comments (0)

Rating: (None)
Views: 37
Comments (0)

Rating: ****
Views: 37
Comments (4)

Rating: (None)
Views: 25
Comments (0)
*

Author Topic: Borumba Dam flood damage repaired ahead of wet season  (Read 2318 times)

0 Members and 1 Guest are viewing this topic.

Offline Member

  • Administrator
  • Legend Member
  • *****
  • Thank You
  • -Given: 2
  • -Receive: 369
  • Posts: 1728
  • Liked: 70
  • Karma: 376
  • Sweetwater Fishing Fanatic
  • View Gallery
Borumba Dam flood damage repaired ahead of wet season
« on: November 10, 2013, 02:09:31 PM »
Borumba Dam flood damage repaired ahead of wet season
6 November 2013. text & images: SEQWater

Seqwater has repaired scouring and erosion at the toe of Borumba Dam in readiness for the summer months.
         
The repairs were required as a result of damage caused by the January 2011 floods.

The toe, made of rock, sits in front of the dam wall and almost 3,600 tonnes of rock was brought in to provide extra protection against erosion. Being so close to the waterway, Seqwater commissioned an environmental study before starting the works to ensure any possible impacts were minimised.

The January 2011 flood waters also deposited around 12,000 tonnes of gravel in the outlet channel downstream of the dam spillway. The gravel has been cleared to improve outflows from the dam.

The remediation works began in May after the wet season to reduce the risk of outflows over the ungated spillway during construction. The timing of the project also allowed for the works to be finished before the Christmas holidays so there would be no impact on the popular camping spot downstream of the dam.

Despite several construction days lost to wet weather and challenges experienced while moving water from one section of the plunge pool to another to allow for access, the works were completed in less than five months.

While every effort was made by the Seqwater project team and the contractor to reduce noise and disruption as a result of the works, Seqwater appreciates and thanks those using the camping facilities downstream for their patience and understanding during this project.

The Borumba Dam project is part of an extensive program of works Seqwater is undertaking to prepare for the 2013-14 wet season.


Sweetwater Fishing Home http://www.sweetwaterfishing.com.au

 

Related Topics

  Subject / Started by Replies Last post
0 Replies
2981 Views
Last post October 09, 2013, 07:22:12 PM
by Member
0 Replies
3256 Views
Last post November 10, 2013, 02:07:13 PM
by Member
4 Replies
4824 Views
Last post May 01, 2015, 11:26:17 AM
by Member
0 Replies
1918 Views
Last post July 01, 2016, 10:02:37 AM
by Member
0 Replies
2083 Views
Last post July 07, 2016, 04:01:00 PM
by Member

Upcoming Events, Fishing Competitions, Shows, Expos etc.....


Upcoming Events