DAILY QUOTE: “Chance is always powerful. Let your hook be always cast; in the pool where you least expect it, there will be a fish.” - Ovid
0 Members and 1 Guest are viewing this topic.
6 March 2012Seqwater advises that a gate release from Wivenhoe Dam will start at 7.30pm. Water will be released at a rate of 170 cubic metres per second, with releases expected to continue for approximately seven days.
19 March 2012Seqwater advises that gate releases from Wivenhoe Dam commenced at 3.00 pm at a rate of 103 cubic metres per second. Releases will be gradually increased to a maximum of 130 cubic metres per second in order to allow Savages Crossing to remain open. Releases are expected to continue for approximately seven days. Twin Bridges is closed but all other bridges are currently open
I don't think the new black stuff at Savages Crossing will survive this one.
Didn't you get the memo Steve? The 3 engineers are to blame for everything
Just received a memo - they've also been pinned for the storm that went thru Townsville this morning.
Started by Member QLD Locations
Started by Member « 1 2 » News Views & Press Releases
Started by Member Weather and Water Updates